Molandco Construction

★☆☆☆☆
  • 1020 E 20th St

    Joplin, MO 64804

    Map & Directions
  • 417-206-2400

Real Estate

Real Estate
More choices in Joplin:
Resultset_next

Stewart & Neece Land Surveying

1201 E 15th St Joplin, MO

Resultset_next

Gary Rose Construction Inc

1632 S Madison St Webb City, MO

1.0 1
Hi! Sign in to let us know how Molandco Construction was?
Write a Review
.

My husband and I signed a contract with Molandco in March of 2008. A few months later, another family started building right down the street from us. They are now moved into their new home and ours? Not done yet. Is that fair? No. We locked in an interest rate and told the contractor, John McGrew, that we MUST close by Dec. 29th or we will lose thousands. Here it is Dec. 23rd and they haven't even finished painting the interior and exterior of the house. They don't care. There are several people in our subdivision who have used Molandco and swear they will never do it again--us, too. We were supposed to close in November. Then early Dec. Then Dec. 12th. Now the 29th and that is not going to happen because there is too much left to be done. The problem is: we locked in a very low interest rate and had to have closed by the 29th or WE LOSE THOUSANDS OF DOLLARS!!! We have talked with Allyn Burt (John's Uncle) and he does nothing. John does not organize nor oversee his construction projects. His subs do not show up when they are supposed to, and when they do, they don't work for long. If something disappears from the construction site (i.e., faucet parts, light fixtures, ceiling fan remotes) they expect YOU to go buy more when it was THEIR subs that lost them in the first place. DO NOT USE MOLANDCO!!! THERE ARE PLENTY OF BUILDERS OUT THERE.

1
★☆☆☆☆

My husband and I signed a contract with Molandco in March of 2008. A few months later, another family started building right down the street from us. They are now moved into their new home and ours? Not done yet. Is that fair? No. We locked in an interest rate and told the contractor, John McGrew, that we MUST close by Dec. 29th or we will lose thousands. Here it is Dec. 23rd and they haven't even finished painting the interior and exterior of the house. They don't care. There are several people in our subdivision who have used Molandco and swear they will never do it again--us, too. We were supposed to close in November. Then early Dec. Then Dec. 12th. Now the 29th and that is not going to happen because there is too much left to be done. The problem is: we locked in a very low interest rate and had to have closed by the 29th or WE LOSE THOUSANDS OF DOLLARS!!! We have talked with Allyn Burt (John's Uncle) and he does nothing. John does not organize nor oversee his construction projects. His subs do not show up when they are supposed to, and when they do, they don't work for long. If something disappears from the construction site (i.e., faucet parts, light fixtures, ceiling fan remotes) they expect YOU to go buy more when it was THEIR subs that lost them in the first place. DO NOT USE MOLANDCO!!! THERE ARE PLENTY OF BUILDERS OUT THERE.

Was this review helpful to you?
Ratings_icons Ratings_icons

Wait, you're the expert.

If you've been to or used Molandco Construction, leave a review.

It's easy, only takes a couple of minutes and you'll help thousands make an informed decision.



Write a Review